Concrete
Footings, foundation walls, slabs, columns, grade beams, formwork, reinforcing steel, placement and finishing. Confirm excavation and pumping boundaries.
MEASUREMENT CONTEXT / CY · SF · LF · TON · EA
Trade coverage
A construction estimate is a collection of connected scopes. Explore what gets measured, the documents that inform it, and the interfaces that deserve a second look.
Footings, foundation walls, slabs, columns, grade beams, formwork, reinforcing steel, placement and finishing. Confirm excavation and pumping boundaries.
MEASUREMENT CONTEXT / CY · SF · LF · TON · EA
CMU, brick, stone, mortar, grout, reinforcement, lintels, flashing, ties and accessories. Read wall sections with the structural details.
MEASUREMENT CONTEXT / SF · CF · LF · EA
Columns, beams, joists, deck, plates, connections, stairs and railings. Distinguish fabrication, erection, coatings and fireproofing.
MEASUREMENT CONTEXT / TON · LF · SF · EA
Studs, joists, headers, sheathing, blocking, backing and connectors. A lumber schedule may separately identify sizes, lengths and grades.
MEASUREMENT CONTEXT / LF · SF · BF · EA
Selective or complete removal, waste handling, temporary protection, and retained elements. Unknown concealed conditions need an explicit assumption.
MEASUREMENT CONTEXT / SF · LF · CY · EA
Membranes, insulation, cover board, flashings, coping, penetrations, drainage interfaces, waterstops and substrate preparation.
MEASUREMENT CONTEXT / SF · LF · EA
Opening sizes, frames, glazing types, hardware sets, ratings and installation. Reconcile plans against door and window schedules.
MEASUREMENT CONTEXT / EA · SF
Gypsum board layers, stud sizes, tracks, shaft walls, soffits, backing, insulation, taping and finish levels.
MEASUREMENT CONTEXT / SF · LF · EA
Finish areas, base, transitions, setting materials, substrate preparation, patterns and a clearly stated waste basis.
MEASUREMENT CONTEXT / SF · LF · EA
Surface preparation, coating systems, coats, trim, ceiling tiles, suspension, perimeter details and access panels.
MEASUREMENT CONTEXT / SF · LF · EA
Casework, counters, panels, trim, finish selections and scheduled accessories. Separate owner-supplied products from installation.
MEASUREMENT CONTEXT / LF · SF · EA
Member coverage, specified system, thickness or rating basis, preparation and access. Coordinate with structural steel and coatings.
MEASUREMENT CONTEXT / SF · LF
Service, feeders, conduits, conductors, panels, switchgear, devices, lighting, controls and equipment connections. Review one-lines and schedules.
MEASUREMENT CONTEXT / LF · EA · LABOR UNITS
Domestic water, sanitary, storm, vent, gas, fixtures, equipment, fittings, valves, risers, supports and insulation. Separate sizes and materials.
MEASUREMENT CONTEXT / LF · EA
Ductwork, air devices, AHUs, RTUs, FCUs, VRF, piping, controls, insulation and accessories. Resolve equipment and controls boundaries.
MEASUREMENT CONTEXT / SF · LF · LB · EA
Suppression piping, sprinkler heads, valves, equipment, supports, and stated testing scope. A takeoff does not replace system design.
MEASUREMENT CONTEXT / LF · EA
Cabling, conduits, trays, pathways, racks, outlets and terminations. Define equipment supply, installation and testing.
MEASUREMENT CONTEXT / LF · EA
Devices, panels, circuits, interfaces, testing and commissioning responsibilities. Confirm what is included in adjacent electrical packages.
MEASUREMENT CONTEXT / LF · EA
Cut, fill, grading, import, export, compaction and subgrade. State the survey basis and whether shrink/swell factors are supplied.
MEASUREMENT CONTEXT / CY · SF · TON
Foundation and trench excavation, backfill, haul-off, and specified support or dewatering. Make ground-condition assumptions visible.
MEASUREMENT CONTEXT / CY · LF
Site water, sewer and storm runs, structures, trenching and connection points. Check the civil/building-service boundary.
MEASUREMENT CONTEXT / LF · EA · CY
Pavement areas, section thickness, aggregate base, edges, milling, markings and restoration limits.
MEASUREMENT CONTEXT / SF · SY · TON · LF
Planting schedules, topsoil, beds, mulch, irrigation boundaries and establishment scope. Reconcile plans and plant schedules.
MEASUREMENT CONTEXT / EA · SF · CY
THE DOCUMENTS MATTER
Plans show the layout. Details show the assembly. Schedules and specifications establish what that assembly needs to contain.
Provide the current architectural, structural, civil, and MEP sheets relevant to your package, together with specifications, schedules, and addenda. Units and measurement rules are confirmed for the requested scope.
Use trade quantity takeoffs for measured scope, material schedules for supplier review, or cost estimating when the assignment needs pricing.
CSI SCOPE ORGANIZATION
These divisions provide a useful scope framework. Project-specific specifications and tender documents determine the actual package boundaries.
YOUR NEXT PROJECT STARTS HERE